Interlock in Oakville
Interlock in Oakville is not an easy task that requires a professional approach and experience. With the independent installation of paving tiles or laying by inexperienced workers are often made annoying mistakes and all sorts of defects. To fix which in Oakville can take a lot of money.
In our company, the tile is laid by experienced specialists. Professional workers will assess the territory, take into account the peculiarities of the landscape and prepare a complete project.
Captain Handy has been installing tiles since 2014. During the last season, more than 80 objects have been completed. More than 17 thousand square meters of paving tiles were laid. Customers have left huge positive feedback on the work of our company.
What objects do we lay?
Our specialists perform the laying of absolutely any object – paths, country houses, cottages, grounds, located near the boulevards and other places.
Where do we do interlocking in Oakville?
Work is performed throughout Ontario and the GTA. Providing a warranty on our work
Among other things, we advise you for FREE on the choice of paving slabs, the choice of paving sites, the pattern of the paving, the arrangement of water runoff, and other issues that have arisen. If you do not have time to purchase materials, we will purchase all the necessary construction materials for paving.
We look forward to your applications! Choose Captain Handy Company
Interlock in Oakville. Technology
Interlock in Oakville is quite economical and simple. This is one of the reasons for the great popularity of this type of paving. Also paving tile has a number of advantages. A wide variety of laying schemes and styles, unlimited opportunities to choose the color scheme. All this allows you to create a unique design for every taste. The average service life of 20 years (several times steadier than the concrete surface). Ideal for both winter and summer conditions.
The main steps in laying tiles:
- Marking.
- Picking up and moving out the ground. Planning.
- Compaction of the working layer of soil.
- Laying of insulating layers. (if necessary)
- Geotextile laying.
- Installation of additional base layers.
- Installation of side stones.
- Arrangement of the base load-bearing layers and their layer-by-layer compaction.
- Installation of the assembly layer.
- Paving tiles with subsequent tamping.
- Trimming the tiles.
- Filling the joints.
Interlocking in Oakville only with Captain Handy!