New Sod Maintenance
Watering Newly Laid Sod
Water is the single most important tip for successful sod installation.
Water Immediately.
Our basic rule has always been: A half inch of water in the first 10-15 minutes is better than 3 inches of water a few hours later.
Water Deeply.
To maximize results, the ground must be kept moist.
Watering Schedule
WATERING GAUGE TIP
- 1. To gauge watering, simply place an empty straight-edge can or container about 6 feet away from the sprinkler.
- 2. When there is a half inch of water in the can, it is time to move the sprinkler to the next area.
- 3. Reflected heat along buildings dries sod quickly. Be sure to water these areas more often.
Mowing Newly Laid Sod
For best results, mow your new sod 7 days after installation and perpendicular to the direction it was laid. Adjust your cutting height if needed.
Mowing Established Sod
Mow your lawn a minimum of once per week, and twice per week during peak growing season (mid Spring/early Summer). NEVER REMOVE MORE THAN 1/3 OF THE GRASS BLADE. Ideal mowing height is 2 1/4” tall but no lower than 1 1/2” and not over 3”.
Moving Tips
- 1. Your new living carpet needs mowing 6-7 days after installation.
- 2. The basic mowing
rule: never remove
more than 1/3 of the
leaf blade during a single mowing. - 3. Set your mower at a cutting height of approximately 2 1/4”.
- 4. For best appearance and better resistance to disease, be sure to keep your mower blades sharp.